Skip to content

What I do

Services

A new bike from scratch, or your current one brought to where it should have been from the shop floor.

Often asked

Before you write.

How long does a custom build take?
Usually six to ten weeks from the first talk to handover. A frame made to measure is the slow part; if the frame exists and is only modified, three to four weeks is possible. I give you a realistic date before we start and tell you if anything changes it.
How much does it cost?
A full custom build starts at about €2,900 and depends mostly on the components. A frame alone starts at €1,400. Setup and fit sessions are €70–90. After we talk you get a concrete quote with every component on its own line, nothing hidden.
Is the frame built from scratch or modified?
Both. Steel hardtails for dirt and street I build from tubes, to a drawing for one specific person. For full-suspension bikes I start from a proven frame and change the geometry through size, angle-sets, fork, offset and linkage, because there the reliability of factory kinematics is worth more than uniqueness.
Can I use my own components?
Yes, if they are sound and fit the idea. I look at them, tell you honestly which would be the weak point, and you decide. Many builds start with a fork, wheels or brakes the customer already loves.
Do you work with riders outside Bulgaria?
Yes. Measures can be taken remotely with video instructions, and the bike travels in a box with instructions for fitting the bar and front wheel. For suspension setup we do a video call after the first rides.
What if something breaks?
Frames I build are guaranteed against defects in material and welds. The bike gets ridden hard and metal fatigues, so the first service after about three months is included: I check welds, bearings and setup. Write to me whenever anything is off.

Ready for a bike that is yours to the last millimetre?

Tell me how you ride. I answer personally, usually within two days.